Projects

Job
Screw Piling Progress
Done0
Remaining0
Days left–
View-only board shared by the job operator. Updates automatically as piles are logged.
Installation Tracker
0%
Complete
0 piles
0%
Installed
0 of 0
0%
Needs attention
0 piles
0%
Pending
0 piles

Recent installs

Needs attention

0 piles
Upload your site plan
Add a site plan image, then drop a pin for each pile and tap it to log torque and status.
Pending
Installed
Complete
Needs extension
Issue

Pile Schedule & Status

Pile Schedule Reference (Types)

Each type defines the pile specifications and target torque used across the job. Assigning a type to a pile fills in its specs, target torque, cap and weld requirement β€” and these show in Field Mode.

Cap Schedule Reference

A cap engages the superstructure above the pile. Give each cap a mark, then set which cap a pile type takes β€” every pile of that type inherits it. A pile that differs can be set on its own from the pile card. A pile with no cap assigned takes no cap.

Project Files

Job Info

Project Setup

β€”

Crew Roster

Add crew names here β€” they appear as a dropdown in the pile modal and field mode.

Project-wide modifications

These change every matching pile on the job at once. Use them to reconcile the record after the fact β€” each one asks for confirmation and tells you how many piles it will touch.

Mark all outstanding cap and weld work as done. Applies only to installed piles that require a cap or a weld and are not marked done yet β€” piles that never needed one are left alone, and cap and weld are judged separately.

Archive

Hide this project from the active list. Nothing is deleted β€” you can unarchive at any time.

Danger zone

Permanently delete this project and all its piles.

Pile

Add A, B, C… suffix for group cap locations (e.g. pile 57A, 57B)
Photos
Extras Gussets, dig-outs, re-welds β€” billable work on this pile

Bulk add / assign piles

Share this project

Anyone with this link can open a live, view-only board β€” no sign-in. It updates automatically as your crew logs progress.

Need to revoke access? Rotating the link makes the old one stop working.

Change password

Operators

Add operator

New project

Top of cap elevations

Colour bands you shade onto the site plan. Values are top of cap as shown on the drawings. Enter a geodetic value, a project value, or both.

Add band

' "
Enter feet and inches, the inches from datum, or a geodetic value β€” the others fill in. All values are top of cap.

Pile type

Cap type

Paste a screenshot, drop a file, or
Crop it from the cap details in the drawings. Any file type; images show inline.

Bulk assign caps

Sets the cap every pile of these types inherits. Piles with a cap set on them individually keep it.

Drop pile

Click the map to place the pile. The number auto-increments with each drop.

Confirm

Field logging
0 logged
PILE
New pile

Add an extra β€”

Billable work done on this pile β€” captured for the office.
1
⚠ Not in schedule
This pile is not in the schedule yet. Log it anyway as a new pile?

Achieved torque β€”

Optional β€” enter the final reading, then tap Done.

Good pile β€”

All optional β€” tap Log Pile to save immediately.

Issue on

Note what's wrong so the office can follow up.

Saved
Replace site plan
Pan and zoom the new drawing until the coloured circles sit on their pile locations, then save.
Zoom
Ghost
Choose PDF page
⬇ Download